T O O L
Modular Feasibility Snapshot
Eight inputs. An indicative cost and schedule band against site-built delivery, the risk flags, and a suitability rating. A range, never a single number — anyone giving you one at this stage is guessing.
Eight inputs. The output is a band and a suitability rating, with the assumptions shown. Nothing is transmitted anywhere.
Not used in the calculation. It changes the code pathway, which needs a real review.