Working notes on where modular pays, where it does not, and what actually breaks when it goes wrong. Published under the firm's name, with sources shown.
The data center bottleneck nobody budgets for
Where 3,000 workers actually sleep — and why accommodation behaves like a long-lead item even though its lead time is short.
Read the noteWhat we are writing next
Published under the firm's name, with sources shown. If one of these would be useful sooner, say so on a call and we will talk it through before it is written.
- Modular versus site-built: where the cost advantage is real, and the four ways projects give it back
- Why modular plants rarely hit their designed throughput
- What a manufacturer needs to change to supply data center programmes
- Why off-site construction breaks a conventional draw schedule
- What design for manufacture and assembly actually changes about your drawings